A. New products development
From drawings to sample design to molding with professional technicians
B. Zinc alloy development
Zinc alloy development sample time within 5 days
C. Copper development
Copper development time within 10 days
D. Monthly output
The monthly production capacity can reach 30T for zinc alloy and 10T for copper,plastic related material products about 2T

Louis Wang +84 858980868 Tel: 0274-6265198 Fax:0274-6265238 E-Mail: yongxinxcgs@163.com
Add: Thua Dat 138,To Ban Do So C3, Khu Pho Binh Phuoc A, Phuo Binh Chuan,Thi Xa Thuan An,Tinh Binh Duong,Viet Nam.